Monitoring The Initialization Processes; Figure 48: Switch Initialization Messages - Allied Telesis XS900MX Series Installation Manual

Stackable 10gigabit ethernet switches
Hide thumbs Also See for XS900MX Series:
Table of Contents

Advertisement

Chapter 6: Powering On the Switch

Monitoring the Initialization Processes

Bootloader 3.1.3-devel loaded
Press <Ctrl+B> for the Boot Menu
Reading filesystem...
Loading flash:xs900-main-20151028-4.rel...
Verifying release... OK
Booting...
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename: xs900-main-20151028-4.rel
Built: Wed Oct 28 06:23:09 UTC 2015
Mounting static filesystems...
Checking flash filesystem...
78
It takes about one and a half minutes for the switch to initialize its
management software programs and features, and load the default
configuration. You may monitor the progress of the initialization process
by watching the switch ID LED. It displays the number "8" for the first
minute and afterwards the number "0."
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program to the Console port on the
master switch. The messages are given in Figure 48 here to Figure 50 on
page 80. The messages may differ slightly depending on whether your
switch is a PoE or non-PoE model.
After the switch has initialized its management software, go to
"Configuring the Switch for Stand-alone Operations" on page 81.
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
Figure 48. Switch Initialization Messages
[
OK
]
[
OK
]
[
OK
]
[
OK
]

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-xs916mxtAt-xs916mxs

Table of Contents