Rack Mount Screw Locations For Front; Rack Mount Screw Locations For Rear - IBM TS2900 Setup, Operator, And Service Manual

System storage tape autoloader
Hide thumbs Also See for TS2900:
Table of Contents

Advertisement

Figure 3-5. Rack mount screw locations for front vertical rails
Figure 3-6. Rack mount screw locations for rear vertical rails
3. Attach the left
3-8
TS2900 Tape Autoloader Setup, Operator, and Service Guide
and right
3
chassis using two flat-head screws
holes on each side.
(Figure 3-7) front brackets to the front of the library
4
on each side. Use the bottom two screw
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

3572

Table of Contents