Installation
6.2.2

Install the cabinet on the foundation

Preliminary requirements
Procedure
1. Carefully lower the cabinet on the
foundation with a hoisting equipment
or a forklift truck. Refer to section
5.6.1.
2. Make sure that the holes in the cabinet
(A) and the foundation (B) are aligned.
3. Install the fasteners (C) and the washers.
4. Tighten the fasteners to the correct torque. For the specification, refer to
section 12.13.
6.2.3

Install the cover plates of the metal foundation

Preliminary requirements
Procedure
1. Install the cover plates (A).
2. Install the fasteners (B).
3. Tighten the fasteners to the correct
torque. For the specification, refer to
section 12.13.
42
Hoisting equipment or
forklift truck
Torque wrench
Caution: Make sure that
there is no kink in the
cables.
Caution: Only use three
fasteners when the power
cabinet is installed in an
array of 2 x n.
The cabinet is installed on
the foundation.
Four fasteners M16 and
washers
16 fasteners M6 (included in
the foundation kit)
A
B
6AGA000032-0115-EN | 004
C
A
B