Install The Border Covers - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

8.4

Install the border covers

Preliminary requirements
Procedure
1. Install these parts:
1. Border covers (A)
2. Fasteners (B)
9AKK108466A3703-EN | 001
Installation engineer
Note:
This procedure is only valid for a standard base or a base with side
entrance.
Access to parts
Set of hex keys
A
B
A
B
71

Advertisement

Table of Contents
loading

Table of Contents