Cable and fiber installation
............................................................................................................................................................................................................................................................
Procedure
Proceed as follows:
........................................................................................................................................................................................................................
1
Refer to the engineering job specification. Determine the function slot that the pack will
be inserted. If equipped with the VLF mains (LNW141 or LNW84) the 100/1000BASE-X
pack can be inserted into any function slots D1, D2, G1 or G2. Otherwise, if equipped
with the non-VLF mains the 100/1000BASE-X pack can be inserted only into function
slots D1 or G1.
........................................................................................................................................................................................................................
2
Label the optical fiber cables, indicating bay, shelf, function group, pack, and direction (IN
or OUT).
........................................................................................................................................................................................................................
3
Route optical fiber cables from the interconnecting equipment into the left side of the
Alcatel-Lucent 1850 TSS-60 and into the 100/1000BASE-X optical ports. See
"Optical fiber routing" (p.
........................................................................................................................................................................................................................
4
Place the optical fiber cables in a protective tube or channel.
........................................................................................................................................................................................................................
5
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
3 - 7 2
3-67).
S
F
T E P S
100/1000BASE-X optical fiber cable installation
"Installation checklist" (p.
Table 3-19,
I-6).
365-372-603R2.0
Issue 1 January 2009