Country-
Level Display/
spec. Set-
Setting
tings
Settling time
1
2
3
4
4
200 – 120000 [ms]
Active curve
1
2
3
4
4
1 - 5
Number of nodes
4
1
2
3
4
2 - 5
Power
0.0 – 100.0 [%]
Voltage
0.0 – 126.0 [%]
Password protection
Status
Properties / functions
1
2
3
4
External grid protection
1
2
3
4
4
disconnection
External grid protection
Status
Powador-protect
1
2
3
4
4
Powador-protect oper-
ation mode
Auto | On | Off
3rd party device
1
2
3
4
3rd party device name
3rd party device opera-
tion mode
On | Off
Password protection
1
2
3
4
4
Status
Page 62
Action in this menu/meaning
F Specify the settling time.
F Select active curve.
NOTE: Up to 5 characteristic curves can be configured independently
and one of them can be activated for regulation each time.
F Specify the number of nodes.
F Specify power for 1st, 5th ... node as a percentage of the maximum
power.
1 Specify voltage for 1st, 5th ... node as a percentage of the maximum
voltage.
2 Activate optional password protection.
3 Confirm the action field.
NOTE: Input screens for advanced device functions
NOTE: Option to detect the external grid protection devices
F Select device.
NOTE: Configures the grid shutdown via a Powador-protect connected
to the digital input of the device.
↻ Auto/On: A Powador-protect is operating in the photovoltaic plant
and is connected to the device at the digital input/output.
F Set the operating mode for Powador-protect.
Auto: The device automatically detects a Powador-protect integrated
into the photovoltaic plant.
On: The digital signal of the Powador-protect must be present at the di-
gital input of the device for the device to start with feed-in.
Off: The device does not check whether a Powador-protect is integrated
into the PV plant.
NOTE: Configures the grid shutdown via a 3rd party device connected
to the digital input of the device
F Enter the name of the 3rd party device.
F Select operation mode.
On: The digital signal of the 3rd party device must be on the device's di-
gital input so that the device does not shut down.
Off: The device does not check whether a 3rd party device is integrated
into the PV system.
1 Option to set password protection.
2 Confirm the action field.
KACO blueplanet 87.0 TL3 KACO blueplanet 92.0 TL3 KACO blueplanet 110 TL3 KACO blueplanet 125 TL3
KACO blueplanet 137 TL3 KACO blueplanet 150 TL3