Chapter 1 Performance Tests
Introduction
Introduction
This chapter provides procedures to test the electrical performance of the
Agilent 53147A, 53148A and 53149A. These procedures are based on the
specifications in Chapter 6, "Specifications."
Two types of testing are provided:
•
Operational Verification
Complete Performance Tests
•
This chapter is organized as follows:
•
Introduction
Equipment Required
•
•
Operational Verification
•
Complete Performance Tests
Performance Test Record
•
Operational Verification
Operational Verification is an abbreviated series of tests that you can
perform (instead of performing the Complete Performance Tests) to
provide a high degree of confidence that the instrument is operating
properly. Operational Verification is useful for incoming inspection,
routine maintenance, and after instrument repair.