ABB Relion 670 Series Commissioning Manual page 207

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 506 371-UUS E
4.
Compare the result with the set value of the negative-sequence operating voltage (consider
that the set value
5.
Repeat steps
signal disappears.
6.
Record the measured current and calculate the corresponding negative-sequence current
according to the equation (observe that the currents in the equation are phasors):
×
3
ANSIEQUATION00021 V1 EN-US
Where:
I
ANSIEQUATION00020 V1 EN-US
a
IECEQUATION00022 V2 EN-US
7.
Compare the result with the set value of the negative-sequence operating current. Consider
that the set value
11.9.2.3
Measuring the trip value for the zero-sequence function
Measure the trip value for the zero-sequence function, if included in the IED.
1.
Simulate normal operating conditions with the three-phase currents in phase with their
corresponding phase voltages and with all of them equal to their rated values.
2.
Slowly decrease the measured voltage in one phase until the BLKV signal appears.
3.
Record the measured voltage and calculate the corresponding zero-sequence voltage
according to the equation (observe that the voltages in the equation are phasors):
×
3
EQUATION1819-ANSI V1 EN-US
Where:
V V
EQUATION1820-ANSI V1 EN-US
4.
Compare the result with the set value of the zero-sequence tripping voltage (consider that
the set value
5.
Repeat steps
signal disappears.
6.
Record the measured current and calculate the corresponding zero-sequence current
according to the equation (observe that the currents in the equation are phasors):
×
3
ANSIEQUATION00019 V1 EN-US
Line distance protection REL670
Commissioning manual
3V2PU is in percentage of the base voltage VBase ).
1
and 2. Then slowly increase the measured current in one phase until the BLKV
=
+
×
+ ×
2
I
I
a
I
a I
2
A
B
C
,
I and I
A
B
C
p ×
2
j
= ×
= -
+
1
e
0, 5
.
j
3
3I2< is in percentage of the base current IBase .
=
+
+
V
V
V
V
0
A
B
C
V
and
are the measured phase voltages
A
B
C
3V0Pickup is in percentage of the base voltage.)
1
and 2. Then slowly increase the measured current in one phase until the BLKV
+
+
I
=
I
I
I
0
A
B
C
© Copyright 2017 ABB. All rights reserved
are the measured phase currents
3
2
Testing functionality by secondary injection
(Equation 103)
(Equation 104)
(Equation 105)
Section 11
M1405-72 v11
201

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents