Section 11
Testing functionality by secondary injection
X1
ANSI09000735 V1 EN-US
Figure 32: Operating characteristic for phase selection function, forward direction phase-
Table 28: Test points for phase-to-ground loop CG (Ohm/loop)
Test point
1
2
3
4
5
6
The table showing test points for phase-to-ground loops is used together with figure 31.
116
W
(
/
X
1
4
85%
ArgNegRes
6
50% RLdFwd
0.5·RFltFwdPP
to-phase faults
Value
X
[X1+XN]
R
0
X
0
R
RLdFwd
X
0.85·[X1+XN]
R
0.85·[X1+XN]·1/tan(60°)+RFFwPE
X
0.85·[X1+XN]
R
-0.85·[X1+XN]·
tan (AngNegRes-90°)
X
RFltFwdPG·tan (LdAngle)
R
RFltFwdPG
X
-0,5·RLdFwd·tan (ArgDir)
R
0,5·RLdFwd
© Copyright 2017 ABB. All rights reserved
phase
)
3
LdAngle
5
60°
2
R
7
ArgDir
ANSI09000735-1-en.vsd
Comments
XN=(X
-X
0
R≈0.491·(X1+XN)+RFFwPE
1MRK 506 371-UUS E
W
(
/
phase
)
)/3