1MRK 506 371-UUS E
11.17.1.1
Verifying the settings
1.
Check the configuration of binary inputs that control the selection of the active setting
group.
2.
Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/Function status/
Setting groups/ActiveGroup
The ActiveGroup menu is located on the PCM600 underMain menu/Test/Function status/
Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and observe
the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups are
described in the corresponding PCM600 documents and instructions for the operators
within the SCS are included in the SCS documentation.
11.17.1.2
Completing the test
continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.18
Exit test mode
The following procedure is used to return to normal operation.
1.
Navigate to the test mode folder.
2.
Change the
3.
Answer
Line distance protection REL670
Commissioning manual
After exiting the IED test mode, make sure that the MU is returned to normal mode.
Enable setting to Disable . Press the 'E' key and the left arrow key.
YES , press the 'E' key and exit the menus.
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
TESTMODE setting to Disabled .
Section 11
M11369-4 v5
M11369-39 v4
SEMOD53244-3 v6
253