Section 11
Testing functionality by secondary injection
7.
Apply a fault condition in the forward directed zone used for scheme communication
tripping.
8.
Check that the no trip from scheme communication occurs.
9.
Check that the trip time from the forward directed zone used for scheme communication
tripping complies with the zone timer and that correct trip outputs, external signals, and
indications are obtained for the actual type of fault generated.
11.11.1.4
Testing delta blocking scheme
1.
Deactivate the receive (CR) signal of the IED.
2.
Apply healthy normal load conditions to the IED for at least two seconds.
3.
Apply a fault condition within the forward directed zone used for scheme communication
tripping.
4.
Check that correct trip outputs and external signals are obtained for the type of fault
generated and that the trip time complies with the
5.
Check that the other zones trip according to their zone times and that a send (CS) signal is
only obtained for the reverse zone.
6.
Check that for a forward fault, carrier send (CS) signal is first obtained from the delta based
fault inception detection (as it is not directional) , and immediately inhibited by the forward
zone.
7.
Activate the IED receive (CR) signal.
8.
Apply a fault condition in the forward directed zone used for scheme communication
tripping.
9.
Check that the no trip from scheme communication occurs.
10.
Check that the trip time from the forward directed zone used for scheme communication
tripping complies with the zone timer and that correct trip outputs, external signals, and
indications are obtained for the actual type of fault generated.
11.11.1.5
Checking of unblocking logic
Check the unblocking function (if the function is required) when checking the communication
scheme.
Command function with continuous unblocking (
Procedure
1.
Activate the guard input signal (CR_GUARD) of the IED.
2.
Using the scheme selected, check that a signal accelerated trip (TRIP) is obtained when the
guard signal is deactivated.
11.11.1.6
Completing the test
continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
222
© Copyright 2017 ABB. All rights reserved
GUID-D5FF46AF-0C5A-4AD4-8F2C-09EC17B681F1 v2
tCoord timer (plus relay measuring time).
Unblock = 1 )
TESTMODE setting to Disabled .
Line distance protection REL670
1MRK 506 371-UUS E
M13868-72 v4
M13868-76 v6
M13868-84 v6
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents