ABB Relion 670 Series Commissioning Manual page 249

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 506 371-UUS E
11.13.3.1
Verifying the settings
1.
Connect the test set for the injection of a three-phase current to the appropriate current
terminals of the IED.
2.
If current need to be injected for a particular test, it should be done in the phase selected by
the
3.
Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
POSOPEN
4.
Test of CB contact travel time
4.1.
4.2. Change the status of the auxiliary contacts such that travel time to open TTRVOP and
4.3. Check that TRVTOPAL and TRVTCLAL are activated.
5.
Test of CB status
5.1.
5.2.
5.3.
5.4. Check the circuit breaker is in INVDPOS if auxiliary contacts read same value or CB is
6.
Test of remaining life of CB
6.1.
6.2. Vary the phase current in the selected phase from below rated operated current,
6.3. The remaining life of CB output CBLIFEPH is estimated when the CB is changed from
6.4. CBLIFEAL is activated as soon as CBLIFEPH is below the set
7.
Test of accumulated energy
7.1.
7.2.
7.3.
7.4.
7.5.
7.6.
8.
Test of CB operation cycles
Line distance protection REL670
Commissioning manual
PhSel parameter.
Test the set timing defined by
tTrCloseAlm .
travel time to close TTRVCL exceed the respective set values (
tTrCloseAlm ). The measured travel time for opening and closing is shown on TTRVOP
and TTRVCL respectively.
Test the set current level defined by
Check the CLOSEPOS output by changing the
Check the OPENPOS output by changing the
inject the current in the selected phase slightly lower and higher than
value. Only for a current lower than set
POSOPEN.
open and inject the current in selected phase more than
Test the set timing defined by
OperNoFault , DirCoef , CBLifeAlmLevel .
RatedOperCurr to above rated fault current, RatedFltCurr of a breaker.
closed to open position. Check that the output CBLIFEPH is decreased with a value that
corresponds to the injected current.
Test the actual set values defined by
AlmAccCurrPwr .
Inject phase current in the selected phase such that its value is greater than set
AccStopCurr value.
When the breaker goes to open position, accumulated energy IPOWPH is calculated. The
calculated value can be seen on the output IPOWPH.
Alarm signal IPOWALPH appears when IPOWPH is greater than set
Lockout signal IPOWLOPH appears if IPOWPH exceeds further to the threshold value
LOAccCurrPwr .
Calculation of accumulated energy IPOWPH is stopped when injected current is lower
AccStopCurr value.
than set
© Copyright 2017 ABB. All rights reserved
0
0
OpenTimeCorr , CloseTimeCorr , tTrOpenAlm and
AccStopCurr .
POSOPEN to 0 and POSCLOSE to 1 .
POSOPEN to 1 and POSCLOSE to 0 and also
AccStopCurr should activate the output
RatedOperCurr , RatedFltCurr , OperNoRated ,
AccSelCal to Aux Contact , ContTrCorr and
Testing functionality by secondary injection
GUID-962A344D-5F8D-49A6-B3AC-29C7FEED0A3D v4
1
0
0
1
tTrOpenAlm and
AccStopCurr set
AccStopCurr set value.
CBLifeAlmLevel value.
AlmAccCurrPwr value.
Section 11