1MRK 506 371-UUS E
Test point
P6
P7
P8
P9
P10
P11
P12
P13
P14
Table 35:
Test point
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
P27
P28
4.
Change the magnitude and angle of three phase voltages to achieve the impedances at test
points P1, P2,...., P28.
5.
For test points P1 to P14, observe the operation value for the signal ZOUT and compare the
operation value with the set value.
6.
For test points P15 to P28, observe the operation value for the signal ZIN and compare the
operation value with the set value.
Line distance protection REL670
Commissioning manual
R
R1FInFw + ∆Fw)
0.8 * (
R1FInFw + ∆Fw
0.0
R1LIn + R1FInRv +
-(0.8 *
∆Rv)
R1FInRv + ∆Rv)
-0.8 * (
RLdOutRv
-
R1FInRv + ∆Rv
-
R1FInRv + ∆Rv)
-0.8 * (
-(
R1FInRv + ∆Rv)
Testing points to measure the inner boundary
R
0.0
0.8 *
R1LIn + R1FInFw
R1FInFw
0.8 *
RLdInFw
R1FInFw
R1FInFw
0.8 *
R1FInFw
0.0
R1LIn + R1FInRv
-0.8 *
-0.8 *
R1FInRv
-
RLdInRv
R1FInRv
-
-0.8 *
R1FInRv
-
R1FInRv
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
X
Comment
R1FInFw + ∆Fw) *
-0.8 * (
ArgLd )
tan (
X1OutRv
-0.8 *
-
X1OutRv
X1OutRv
-0.8 *
R1FInRv + ∆Rv) *
-0.8 * (
ArgLd )
tan (
0.0
0.0
R1FInRv + ∆Rv) *
0.8 * (
ArgLd )
tan (
0.8 *
X1OutFw
X
Comment
X1InFw
0.8 *
X1InFw
R1FInFw + ∆Fw) *
(0.8 *
ArgLd )
tan (
0.0
0.0
R1FInFw + ∆Fw) *
-(0.8 *
ArgLd )
tan (
X1InRv
-0.8 *
-
X1InRv
X1InRv
-0.8 *
-(0.8 * -
R1FInRv + ∆Rv) *
ArgLd )
tan (
0.0
0.0
(0.8 * -
R1FInRv + ∆Rv) *
ArgLd )
tan (
0.8 *
X1InFw
Section 11
OperationLdCh = Off
If
If
OperationLdCh = Off
OperationLdCh = Off
If
129