Section 11
Testing functionality by secondary injection
ANSI07000010 V1 EN-US
Figure 28: Proposed test points for phase-to-ground faults
Table 25:
Test
points
1
2
3
Check also in the same way as for phase-to-ground fault for each test point that the output
signals PHG_FLT, are activated where x refers to the actual phase to be tested. After the timer
for the zone has elapsed, also the signals TRIP, TRPG and TR_x shall be activated.
11.4.4
Faulty phase identification with load encroachment FMPSPDIS
(21)
There is no specific test routine for this function. The function is tested in conjunction with other
impedance (mho) functions.
11.4.5
Distance protection zones, quadrilateral characteristic, separate
settings ZMRPDIS (21)
Prepare the IED for verification of settings as outlined in section
chapter.
Consider releasing Zone 1 with the Phase selection with load encroachment, quadrilateral
characteristic (FRPSDPIS). If the autorecloser is not released and in service, trip will always be
three phase.
110
X
50%
ZAngPG
Test points for phase-to-ground loops A-B (Ohm/Loop)
Reach
Value
X
ZPG · sin(ZAngPG)
R
ZPG · cos(ZAngPG)
X
0,5·ZPG · sin(ZAngPG)
R
0,5·ZPG + ΔR = 0,5·ZPG · (1 - cos(ZAngPG))
X
0,5·ZPG·sin(ZangPG)
R
0,5·ZPG - ΔR = 0,5·ZPG · (1 - cos(ZAngPG))
© Copyright 2017 ABB. All rights reserved
R
Ohm/loop
ANSI07000010-1-en.vsd
Comments
"Preparing for test"
1MRK 506 371-UUS E
tPG
GUID-79761A97-A99A-4788-94A5-341308DF6E45 v3
GUID-A35C2DED-70A6-4E96-864D-3A6C1147B350 v3
in this
Line distance protection REL670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents