ABB Relion 670 Series Commissioning Manual page 81

Line distance protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 506 371-UUS E
IEC140000138 V1 EN-US
Figure 10: Verifying the TCP communication using PMU Connection Tester
Now it should be possible to see the streaming synchrophasor data. In the Graph tab, observe
the Frequency, data Reporting Rate, Phasor names, and Phase angles of the reported
synchrophasors. Observe the real-time frame details of the Data Frame in the bottom of the
window.
IEC140000139 V1 EN-US
Figure 11:
Open the drop-down menu in the
sent from the client (PMU Connection Tester) to the PMU. Try different commands and make
sure that the PMU is receiving and responding to them.
Line distance protection REL670
Commissioning manual
Graphic view over streaming synchrophasor data
Command field. There is a list of commands that can be
© Copyright 2017 ABB. All rights reserved
Establishing connection and verifying the IEEE C37.118/1344 communication
IEC140000138-1-en.vsd
IEC140000139-1-en.vsd
Section 9
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents