Test of delayed fault clearing for single pole tripping
Connect the test set for the injection of three phase voltages and currents to the appropriate
terminals of the IED.
Enable the delayed fault clearance for single pole tripping by setting
(Enabled) , Del3PhOp to FALSE (Disabled) and also connect the inputs BLKDLFLT and
FUSEFAIL to FALSE.
Also assume circuit breaker is in closed position, that is input CBCLD is high, prior to fault
occurrence.
Create a single phase fault on phase A such that phase A voltage is lower than
quadrature phase to phase voltage and set
current such that it exceeds set
Check that output TRIN is activated after a set delay of
Check that TRIP and TR_A are generated with the conditions described after a set delay time
t1Ph and the outputs ARST and ARST_A are also activated.
of
Check that activated trip signals and pickup signals are blocked by enabling BLKTR and
BLKST.
Check that all activated signals are disabled by BLOCK input.
If required, perform creating faults on the remaining phases in the similar way.
Test of delayed fault clearing for three pole tripping
Connect the test set for the injection of three phase voltages and currents to the appropriate
terminals of the IED.
Enable the delayed fault clearance for three pole tripping by setting
(Enabled) , Del1PhOp to 3Ph (Disabled) and also set the inputs BLKDLFLT and FUSEFAIL to
FALSE.
Also assume circuit breaker is in closed position, that is, the input CBCLOSED is high prior to
fault occurrence.
Create a BC fault such that their phase voltage magnitudes are lower than
corresponding quadrature phase to phase voltage and set
Check that TRIP, TR_A, TR_B and TR_C are generated after the set delay time of
ARST, ARST3PH, ARST_A, ARST_B and ARST_C are also activated.
Check that activated trip signals and pickup signals are blocked by enabling BLKTR and
BLKST.
Check that all activated signals are disabled by BLOCK input.
11.6.7.2
Completing the test
Continue to test another function or end the testing by setting the parameter
Disabled under: Main menu/Tests/IED test mode/TESTMODE:1
Restore connections and settings to their original values if they were changed for testing
purposes.
11.7
Frequency protection
11.7.1
Underfrequency protection SAPTUF (81)
Prepare the IED for verification of settings outlined in Section
settings".
Line distance protection REL670
Commissioning manual
Pickup_N value.
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
Tau to default value and also inject the residual
tResCurr if ResCurrOper is set to high.
Tau to default value.
"Preparing the IED to verify
Section 11
Del1phOp to 1Ph
VPhSel< times
Del3phOp to TRUE
VPhSel< times
t3Ph and
GUID-4AFACF9B-9CA8-4960-9806-316FFCFEDEC0 v1
TestMode to
SEMOD53547-1 v1
M16289-2 v7
193

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents