Section 11
Testing functionality by secondary injection
Test point
10
11
12
13
Table
30
40% of RLdFwd
80% of RLdFwd
encroachment)
ANSI05000369 V2 EN-US
Figure 34: Distance protection characteristic with test points for phase-to-ground
Table
31
Table 31:
Test point
1
2
3
Table continues on next page
120
Reach
Set value
X
0.5 x X1
set
R
–0.23 x X1
set
X
0.8 x X1
set
R
–0.37 x X1
set
X
0.5 x X1
set
R
0.5 x R1
set
X
0
R
0.5 x RFPPZx
is used in conjunction with figure 33.
2
1
11
10
12
120°
a
9
8
alt. 80% of
RFPG
RFPG (Load
measurements
is used in conjunction with figure 34.
Test points for phase-to-ground C-G (Ohm/Loop)
Reach
Value
X
(2 x X1
+X0
set
R
0
X
(2 x X1
+ X0
set
R
2 x R1
+ R0
set
X
0.8 x (2 x X1
R
0.8 x (2 x R1
+RFPG
set
© Copyright 2017 ABB. All rights reserved
Comments
Exact –0.5 x R1
Exact –0.5 x R1
80%
3
50%
4
5
6
7
13
20°
ANSI05000369-2-en.vsd
Comments
)/3
set
)/3
set
)/3
set
+ X0
)/3
set
set
+ R0
)/3
set
set
1MRK 506 371-UUS E
x tan(ArgNegRes=30°)
set
x tan(ArgNegRes=30°)
set
Line distance protection REL670
Commissioning manual