Section 11
Testing functionality by secondary injection
ReverseR
=
R
RvsR
EQUATION14050 V1 EN-US
ReverseR
=
X
RvsX
EQUATION14051 V1 EN-US
and the voltages that are related to them:
V
Z
=
t FwdZ
,
EQUATION14052 V1 EN-US
V
Z
=
t RvsZ
,
EQUATION14053 V1 EN-US
The previous calculations are in primary values. They are transferred to secondary values to
perform injections by a test set. Primary values are transferred to secondary values by taking into
account the CT ratio and the VT ratio (respectively 9000/1 A and 13.8/0.1 kV in the example).
The magnitude of the secondary voltages, that are related to the points RE and SE of the R-X
plane, needs to be checked.
RE (R
FwdR
V
V
=
t FwdZs
,
EQUATION14054 V1 EN-US
SE (R
RvsR
V
V
=
,
t RvsZs
EQUATION14055 V1 EN-US
The tests, which are described in this section, may require voltages that have magnitude equal to
110% of the previous values. The continuous permissive overload voltage of the protection voltage
channels of the TRM module is 420 V; so the previous voltages may be applied to the analog
channels of the IED continuously. Limitations may be related to the available test set; the current I
was calculated by using a factor 2.5 (instead of the maximum value 4) in order to reduce the
magnitude of the test voltage for the points RE and SE.
Test sets usually do not have a feature to simulate a real network during a power swing and apply
the related analog quantities at the terminal of the generator. The scope of the present test is not
a simulation of a real network. Voltages and currents are supplied in order to measure an
impedance that changes in the time and traverses the plane R-X and, in particular, the area inside
the lens characteristic. The test may be performed by applying:
Symmetric three-phase voltage at 50 Hz. The magnitude depends on the point of the
characteristic that needs to be verified. The following three main points of the line segment
SE-RE need to be checked:
140
0 29
.
×
=
×
0 9522 0 003
ZBase
100
100
29 6
.
×
=
×
0 9522 0 282
ZBase
100
100
2
2
I
R
X
×
=
+
×
FwdZ
t
FwdR
FwdX
2
2
I
R
X
×
=
+
×
RvsZ
t
RvsR
RvsX
, X
):
FwdX
V
0 1
.
VT s
,
11931
×
=
×
t FwdZ
,
V
13 8
.
VT p
,
, X
):
RvsX
V
0 1
.
VT s
,
5899
×
=
×
=
,
t RvsZ
V
13 8
.
VT p
,
© Copyright 2017 ABB. All rights reserved
.
=
.
.
=
.
2
2
I
0 078
.
0 565
.
20918 0 570 0 20918 11931
=
+
×
t
2
2
0 003
.
0 282
.
20918 0 282 2 20918 5899
I
=
+
×
t
86 45
.
V
=
42 75
.
V
.
V
=
×
=
.
V
=
×
=
Line distance protection REL670
Commissioning manual
1MRK 506 371-UUS E
(Equation 10)
(Equation 11)
(Equation 12)
(Equation 13)
(Equation 14)
(Equation 15)
t

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel670

Table of Contents