SC-F9200 Series
Replaced or Repaired
Class
(Reattached) Part/Unit
Main Board
(NVRAM backup NG)
Board related
parts/units
Replacement
Main B Board
After
(Network Board)
replacement
Replacement
Power Supply Board
After
replacement
ADJUSTMENT
Table 4-1. Adjustment items and the order by repaired part
Required Operations
30 Turn the power on in normal mode
31 Check the firmware version on the control panel.
32 Manual Adjustment for Data shift
33 Manual Uni-d Adjustment for Between 2 pcs Heads.
34 Manual Uni-d adjustment
35 Manual Bi-d adjustment
After
replacement
36 PF Motor Measurement & Automatic Adjustment
37 Pump Motor Measurement & Automatic Adjustment
38 CR Active Damper Adjustment (Automatic)
39 CR Motor Measurement & Automatic Adjustment
40 Turn the power on in Serviceman mode.
41 Reset the Main Board exchange counter.
1
Replacement
2
Turn the power on in normal mode.
3
Update the firmware.
4
Turn the power on in Serviceman mode.
5
MAC Address Input
1
Replacement
2
Turn the power on in normal mode.
3
CR Motor Measurement & Automatic Adjustment
4
PF Motor Measurement & Automatic Adjustment
5
Main Unit Measurement & Automatic Adjustment
6
Make the replacement date & time setting.
Service
Program
---
---
√
√
√
√
√
√
√
√
---
√
---
---
√
---
√
---
---
√
√
√
√
Overview
Jig
Media
Replaced
Reattached
√
√
√
PGPP
√
PGPP
√
PGPP
√
PGPP
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
SE Group Confidential (Related Staff Only)
Revision C
Page
---
---
√
p.321
√
p.323
√
p.325
p.327
---
p. 356
---
p. 356
---
p. 305
---
p. 356
---
---
p. 346
---
√
p. 124
---
p. 291
---
---
p. 344
---
√
p. 125
---
p. 356
---
p. 356
---
p. 356
---
p. 346
---
271