Epson SC-F9200 Series Service Manual page 161

Large format color inkjet printer
Hide thumbs Also See for SC-F9200 Series:
Table of Contents

Advertisement

SC-F9200 Series
3.4.5.9 CR Motor
When replacing/removing this part, refer to
A D J U S T M E N T
R E Q U I R E D
Items and the Order by Repaired Part" (p260)
perform the specified operations including required adjustment.
(p98)
1.
Unlock the CR Unit.
2.
Remove the Media Loading Lever.
3.
Remove the Right Upper Cover.
4.
Remove the Left Rear Cover.
(p110)
(p111)
5.
Remove the Left Upper Cover.
(p114)
6.
Remove the Left Cover.
(p167)
7.
Remove the APG Unit.
8.
Loosen the two screws (A) that secure the pulley holder.
Before loosening the tension at the next step, mark the position of
C H E C K
P O I N T
the pulley holder to make the required adjustment easier.
9.
Loosen the screw (B) to loosen the tension of the CR Timing Belt.
DISASSEMBLY & ASSEMBLY
"4.1.2 Adjustment
and make sure to
(p210)
(p103)
Disassembly and Assembly Procedure
- Left side -
A
A
B
Figure 3-100. Loosening the CR Timing Belt Tension
SE Group Confidential (Related Staff Only)
Revision B
Pulley Holder
161

Advertisement

Table of Contents
loading

Table of Contents