IBM B01 Service Manual page 210

Ibm s/390 integrated server 3006
Table of Contents

Advertisement

59 Checkout procedure
This step is the final checkout procedure after you
exchange FRUs or correct a fault condition.
To verify the repair:
• Press PWR RESET on any OCA with
indicators NOT in the following condition:
PWR IN on
-
PWR OUT on
- All
others off
• Wait two minutes and check for the following
correct condition of the indicators:
PWR IN on
-
PWR OUT on
- All
others off
If the indicators are not correct, go back to the
beginning of this procedure. (See Note).
If the indicators are correct, do the following:
• Ensure that all parts you removed have been
replaced and all cables you removed are now
plugged correctly.
• On the System Power Status window, select
Service Mode then select Exit Service Mode.
• The call is complete.
End of
procedure
Power Failures
Note: If you go through this procedure more than
two times without resolving the problem, call for
assistance.
Chapter 9. Power
189

Advertisement

Table of Contents
loading

Table of Contents