Ryobi 3302H Operation Manual page 185

2-color offset press
Table of Contents

Advertisement

Chapter 2 Periodic Inspection
d. The pressure between the metering roller and water oscillating roller (C)
Checking procedures - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,
Shift the metering roller release lever in the direction of the arrow
(
~
position) to contact the metering roller with the water fountain
roller.
At this time, set the water volume control dial to "0".
Run the press.
Shift the water roller cleaning lever in the direction of the arrow
( ~ position) and contact the bridge roller with the water oscillating
roller, to apply ink on the water oscillating roller.
After that, shift the water roller cleaning lever back to the
~
position.
Stop the press.
Push the water form roller ON button to contact the metering roller
with the water oscillating roller.
After a few seconds, push the water and ink form roller OFF button
to release the metering roller from the water oscillating roller.
«NOTICE»
Be sure to push the water and ink form roller OFF button to
release the metering roller from the water oscillating roller.
If rotating the rollers with the metering roller contacting the
water oscillating roller, the metering roller surface and water
fountain roller motor will be damaged.
Maintenance Edition - 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3302ha

Table of Contents