Lv 6 Finishing Installation; Finishing Installation - Uponor Smatrix Move PRO Installation And Operation Manual

Hide thumbs Also See for Smatrix Move PRO:
Table of Contents

Advertisement

EN
6

Finishing installation

CZ
DE
DK
3
EE
ES
S
B M
22
bu s
M od
21
micr
oSD
RJ 45
FI
2
FR
HR
HU
IT
LT
LV
NL
NO
PL
PT
RO
RU
SE
SK
3 6
4
1
2
L
T
N
m A
12 5
L
N
80
79
78
77
76
75
74
73
72
71
30
29
28
27
26
25
24
23
Base
PRO
5
6
Make a complete check up of the installation:
1. Make sure all wiring is done correctly and that the
wires are thoroughly fastened.
2. Re-attach the terminal covers to the controller.
3. Check the mixing valves.
Increase the setpoints in each zone to make sure
the valves are opening correctly.
4. Set system parameters in the controller to the
defined operating settings.
5. Print and fill in the "Installation report" located at
the end of the manual.
6. Give the manual and all information about the
system to the user.
U P O N O R S M AT R I X M O V E P R O · I N S TA L L AT I O N A N D O P E R AT I O N M A N U A L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Smatrix Move PRO and is the answer not in the manual?

Table of Contents