Engine Timing Marks; Propeller Installation; Typical Nicks And Removal Methods; Engine Installation (Pa-24-260 Turbocharged) - Piper PA-24 Comanche Service Manual

Hide thumbs Also See for PA-24 Comanche:
Table of Contents

Advertisement

PIPER COMANCHE SERVICE MANUAL
LIST OF ILLUSTRATIONS
(eont.)
Figure
Aerofiche
Grid No,
REVISED: 4/10/81
7B-6.
7B-7.
7B-8.
7B-9.
7B-10.
7B-11.
7B-12.
7B-ll
7B-14.
7B-15.
7C-I.
7C-2.
7C-l
7C-4.
7C-5.
7C-5a.
7C-6.
7C-7.
7C-8.
7C-9.
7C-IO.
7C -II.
7C-12.
7C-I3.
7C-14.
7C-15.
7C-16.
7C-17.
8-1.
8-2.
8-3.
8-4.
8-5.
8-6.
8-7.
8-8.
8-9.
8-10.
8-11.
8-12.
8-13.
8-14.
8-15.
8-16.
8-17.
8-18.
8-19.
Idle Speed and Mixture Adjustment (Fuel Injector)
.
Fuel Air Bleed Nozzle
.
Magneto Timing Marks
.
Reworked Plain Washer
.
Filed Notch on Cam ...........................•...........................
Installation of Rotor Holding Tool and Timing Pointer
.
Alignment of Cam in Inspection Hole ..................•.....................
Engine Timing Marks
.
Ignition System Retard Breaker Magneto Installation
.
Removal of Seized Spark Plug
.
Propeller Installation
.
Typical Nicks and Removal Methods
.
Propeller Governor
.
Engine Installation (PA-24-260 Turbocharged) .............•...................
Schematic Diagram of Turbocharger System
.
Indicator Probe Installation
.
Schematic Diagram Of RSA Fuel Injector System (PA-24-260 Turbocharged)
.
Fuel Injector
.
Fuel Air Bleed Nozzle ..................•............. "
.
Contact Points
.
Rotor Holding Tool Installed
.
Timing Kit Installed ................•......................................
Aligning Timing Marks Single Contact Assembly Magneto
.
Forming Leads in Breaker Compartment
.
Engine Timing Marks
.
Magneto Timing Marks .................•..................................
Removing Frozen Spark Plug ...........................•...................
Turbo Oil Flow Check
.
Fuel Cell Installation (Main/Inboard) .........••.............................
Fuel Svstem Schematic PA-24-180
.
Fuel System Schematic PA-24-250. Serial Nos. 24·105 to 24-2298
.
Fuel System Schematic PA-24-250. Serial Nos. 24-2299 and up and PA-24-260
.
Fuel System Schematic PA-24-260 (Turbo)
.
Fuel System Schematic PA-24-400
.
Bayonent Fasteners
.
Button Fasteners
.
Checking Sender Unit
.
Checking Fuel Gauge
.
Three Position Fuel Valve PA-24-180 and PA-24-250
.
Five Position Fuel Valve PA-24-250 and PA-24-260
.
Fuel Valve and Filter PA-24-400
.
Fuel Strainer Disassembled PA-24-400 .........•...•.........................
Bendix Plunger Fuel Pump (Early)
.
Bendix Plunger Fuel Pump (Late)
:
.
Exploded View Bendix Rotary Fuel Pump
.
Primer Pump (Carburetor Induction System)
.
Fabricated Fuel Quantity Transmitter Checking Jig
.
2AS
2FJO
2FI2
2Fl4
2FI4
2FI5
2FI5
2FI6
2Fl7
2F20
2F22
2GI2
2GI3
2GI5
2G22
2G23
2H3
2H7
2H9
2HIO
2H 12
2H14.
2HI4
2H 15
2HI5
2HI6
2HI6
2HI9
2H22
2114
2115
2116
2117
2118
2120
2121
2121
2124
2124
2J3
2J5
2J5
2J7
2J9
2J9
2J 12
2JI5
2JI15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents