Bellcrank Checking Tool Installation; Aileron Adjusting Points View - Piper PA-24 Comanche Service Manual

Hide thumbs Also See for PA-24 Comanche:
Table of Contents

Advertisement

o
PIPER COMANCHE SERVICE MANUAL
o
e
2
3
e
I. la.L.CltAllll
ITO" ILOCll
L
'TW .IoT
•• Ia.&.CIlMC
4. COli,...&.
c.a.U
'l'VltlllUCIliI.I
o
o
o
2
AlII
4
o
I.
CO"'I'''OI. C"'101 ,,'I'''''CIO....'''I'
,01oT
1. "U11
I~
.."
J • • • Io.e . . . . . . 'YOT 1010T
•• CIOICIlI"1 TOOl.
FIGURE &-3. INSTA1.UnON Of
8ELLCRANK CHECKING TOOL
fleURE W. AILERON ADJUSTING POINTS
6.
If the
forward
control cables ill die NIc1Ite
1ft
iIlmUcd.
COIlMCt
die
strap
fitti.al
(7)
of
the
cables
at statiOD
126.5 . . . bolt. nut: and comr
piD.
Co
lnsu.llarion of me left and/or
rilht
prim.".
control cable(s) witbin me
fuIelace
may
be.
&ccomplilhcd
by
the
followinl procedure:
1.
From the
pulley
duster
within
me
fasellp
at
scarion 11.5 .0,
draw
the
primuy
cable forwud
through
the
floor support: bulkheads.
Under the
pulley
dURer
at
lUCion 50.0 and
up
to the
vertical sprocket
chain.
CAtn10N
Whm
striap.n,
the cabla
OD
the from
pulley
duaer
jQ.ft
aft
of 6ft wall,
be
sure
to thrad cable in the
puDey IfOOW
and not
OWl'
tOP of either
the front
Of
bottom cable
pvds.
(Refer to View A·A
of Fipre S-Z.)
Z. Connect the cable with aambuck1e to the
Ymic:al chaift
UIiDt
devis bolt:, bushint. nut ..
~:1
COtter
pin.
3.
CoMCC't
the
fuelace
primu'y cable
with
the
win,
primary cablc
by
UK
of bolt, washer and
nut throuJb a shackle at
fuclqc
station 1%6.5.
4.
Replace the
cable pard
(15)
at
thc paDcy
cluRcr
aft of me rar spar ud the two cable I'W'ds
at the
pulley
cluster
at
surion 50.0,
safcry
the pU'dI.
ci.
Set cable tCftJion per Table
V-I.
check
riaiDI
and
adjusanCllt per """"'h 5·11
and
ucerta.in
that all tumbuck1cs are
saieticd.
c.
Install
access plates
aDd pmcls,
carpets. sat
tracks
and
sella.
SURFACE CONTROLS
ISSUED: 8118n2
IG4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents