Vll Resilience With Two Destination Pe Nodes; Figure 48: Vll Resilience - Alcatel-Lucent 7750 SR Manual

Os services guide
Hide thumbs Also See for 7750 SR:
Table of Contents

Advertisement

Virtual Leased Line Services

VLL Resilience with Two Destination PE Nodes

Figure 48
illustrates the application of pseudowire redundancy to provide Ethernet VLL service
resilience for broadband service subscribers accessing the broadband service on the service
provider BRAS.
7x50 ESS
7x50 ESS
Eth SAP
Primary Eth
Eth SAP
(primary)
PE 1
IP/MPLS
PE 2
DSLAM
Standby
backup Eth
7x50 ESS
PW
BRAS 1
Eth SAP
(standby)
PE 3
OSSG115

Figure 48: VLL Resilience

If the Ethernet SAP on PE2 fails, PE2 notifies PE1 of the failure by either withdrawing the
primary pseudowire label it advertised or by sending a pseudowire status notification with the
code set to indicate a SAP defect. PE1 will receive it and will immediately switch its local SAP to
forward over the secondary standby spoke SDP. In order to avoid black holing of in-flight packets
during the switching of the path, PE1 will accept packets received from PE2 on the primary
pseudowire while transmitting over the backup pseudowire. However, in other applications such
as those described in
Access Node Resilience Using MC-LAG and Pseudowire Redundancy on
page
225, it will be important to minimize service outage to end users.
When the SAP at PE2 is restored, PE2 updates the new status of the SAP by sending a new label
mapping message for the same pseudowire FEC or by sending pseudowire status notification
message indicating that the SAP is back up. PE1 then starts a timer and reverts back to the primary
at the expiry of the timer. By default, the timer is set to 0, which means PE1 reverts immediately.
A special value of the timer (infinity) will mean that PE1 should never revert back to the primary
pseudowire.
The behavior of the pseudowire redundancy feature is the same if PE1 detects or is notified of a
network failure that brought the spoke SDP operational status to DOWN. The following are the
events which will cause PE1 to trigger a switchover to the secondary standby pseudowire:
7750 SR OS Services Guide
Page 223

Advertisement

Table of Contents
loading

Table of Contents