Power Connections
3 1
O
nce all hard
interfaces have been connected, the system can be powered on.
Checklist
1 3 1
BEFORE powering on the system, please check the following:
CBM: Make sure the CBM has been properly installed before
Hard drives: Hard drives are correctly installed in the drive trays.
Drive trays: All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
Cable connections: The system has been correctly connected to h
computer(s), management computers,
Ambient temperature: All system components have been acclimated
to the surrou
NOTE
Make sur
e you u
DO NOT use extension cables as the power cables are designed to connect ONLY
CTLY to
and DIRE
EonStor / EonStor DS S12/S16/S24 Series
drives have be
en properl
powering-on the system.
nding temperature.
se the power cables
relocatable power t
y installed and
the I/O ports
or external networking devices.
provide
d that are at least 1.2 meters in length.
ap
s (RPTs) on server cabinets.
112
or
manageme
nt
ost