Power Connections; Checklist - Infortrend EonStor DS 1000 Gen2 Series Hardware Manual

Hide thumbs Also See for EonStor DS 1000 Gen2 Series:
Table of Contents

Advertisement

Power Connections

Once all hard drives have been properly installed and the I/O ports or management
interfaces have been connected, the system can be powered on.

Checklist

BEFORE powering on the system, please check the following:
 CBM: Make sure the CBM has been properly installed before
powering-on the system.
 Hard drives: Hard drives are correctly installed in the drive trays.
 Drive trays: All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
 Cable connections: The system has been correctly connected to host
computer(s), management computers, or external networking devices.
 Ambient temperature: All system components have been acclimated
to the surrounding temperature.
NOTE
Make sure you use the power cables provided that are at least 1.2 meters in length.
DO NOT use extension cables as the power cables are designed to connect ONLY
and DIRECTLY to relocatable power taps (RPTs) on server cabinets.