Installation Procedure - Infortrend S12 Series Hardware Manual

Table of Contents

Advertisement

Installation Procedure

1 8 8
1. Determine rail installation
u
sing M5 flathead screws (04) must match on front and rear posts. Place two cage
n
uts (06) on the two outer most holes of the front post between the
(04). Between the two M5 flathead screws on the front rack post, leave 4-hole spaces
(indicated by the
04
Rear rac
Determine rail length, secure rail to posts and place cage buts
2.
Attach filler plates (07) to the left / right ears of the enclosure using cross recess
flathead screws #6-32 (05). The R and J on the filler plates indicate RAID and JBOD,
respectively.
IFT-9279CSlider36 Slide Rail Kit
position. The screw-hole locations that secure the slide rail
blue
circle).
k post
Front rack post
206
M5 flathead screws
06
04

Advertisement

Table of Contents
loading

Table of Contents