Chapter 10: Powering On The Stack - Allied Telesis AT-IE510-28GSX Installation Manual

Industrial ethernet switch
Table of Contents

Advertisement

Chapter 10
Powering On the Stack
This chapter contains the following procedures:
"Powering On the Switches Individually" on page 106
"Powering On the Switches Simultaneously" on page 108
"Verifying the Stack" on page 110
"Monitoring the Stack Initialization Processes" on page 113
Perform "Powering On the Switches Individually" on page 106 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform "Powering On the Switches Simultaneously" on
page 108 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the AT-IE510-28GSX Command
Reference on AlliedTelesis.com.
Note
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
105

Advertisement

Table of Contents
loading

Table of Contents