Monitoring The Switch Initialization Process - Allied Telesis AT-IE510-28GSX Installation Manual

Industrial ethernet switch
Table of Contents

Advertisement

Monitoring the Switch Initialization Process

It takes about thirty seconds to initialize the management software. To
monitor the initialization process, do one of the following:
Watch the switch ID LED. It displays the number "8" for about the
first 15 seconds and then the number "1."
Connect a terminal, or a computer that has a terminal emulator
program, to the Console port on the switch. The bootup sequence
is complete when the "awplus login" prompt appears.
After the switch is initialized, do one of the following:
If you are installing a VCStack, go to Chapter 8, "Verifying the
Status of VCStack" on page 89.
If you are installing a stand-alone switch, go to Chapter 7,
"Configuring the Switch for Stand-alone Operations" on page 79.
AT-IE510-28GSX Installation Guide
71

Advertisement

Table of Contents
loading

Table of Contents