Monitoring The Initialization Process; Figure 52: Initialization Messages - Allied Telesis IE340 Series Installation Manual

Industrial ethernet layer 3 switches
Hide thumbs Also See for IE340 Series:
Table of Contents

Advertisement

IE340 Series Installation Guide

Monitoring the Initialization Process

Verifying release... OK
Booting...
Uncompressing Linux... done, booting the kernel.
Starting base/first...
Mounting virtual filesystems...
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename: IE340-main-20190213-1.rel
Built: Tue Feb 12 22:58:46 UTC 2019
Mounting static filesystems...
Checking flash filesystem...
Mounting flash filesystem...
Checking for last gasp debug output...
Initializing random number generator...
Starting base/hwrandom...
Starting base/dbus...
Starting base/linux...
Starting base/syslog...
Starting base/loopback...
Starting base/poe_done...
Received event syslog.done
Starting base/modules...
Received event module.done
tarting base/reboot-stability
Checking system reboot stability
Starting base/apteryx...
Starting base/debugevent...
110
It takes several minutes for the switch to initialize its operating system and
load the default configuration. You can monitor the bootup sequence by
connecting a terminal or computer with a terminal emulator program to the
Console port on the front panel. The parameter settings for the Console
port are found in "Starting a Local Management Session" on page 113.
Figure 52 here and Figure 53 on page 111 contain the initialization
messages.
After monitoring the initialization process, go to "Starting a Local
Management Session" on page 113.
Figure 52. Initialization Messages
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]
[ OK ]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ie340-12gpIe340-12gtIe340-20gpIe340l-18gp

Table of Contents