Figure 20: Verifying The Din Rail Installation - Allied Telesis IE200 Series Installation Manual

Industrial ethernet switches
Hide thumbs Also See for IE200 Series:
Table of Contents

Advertisement

Chapter 3: Installing the Switch
64
3. Visually inspect the bracket to verify that the DIN rail is now fitted into
the top and bottom slots. Refer to Figure 20.
Top slot
Bottom slot
Figure 20. Verifying the DIN Rail Installation
Note
Allied Telesis recommends installing DIN rail end clamps to the
sides of the switch to prevent damage or network traffic loss from
vibration or shock. End clamps are not available from Allied Telesis.
4. Go to Chapter 4, "Cabling the Ports" on page 71.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie200-6ftAt-ie200-6fpAt-ie200-6gtAt-ie200-6gp

Table of Contents