Omron NX701-1 User Manual page 60

Machine automation controller nj/nx-series cpu unit
Hide thumbs Also See for NX701-1:
Table of Contents

Advertisement

2 Motion Control Configuration and Principles
Using Motion Control Instructions in a Priority-5 Periodic Task
If second high-speed motion control after the primary periodic task is required, place the motion control
instructions (FB) in a priority-5 periodic task.
The basic operation is the same as that of the primary periodic task.
 Timing of Processing
Slave A
Priority-5
periodic task
1
Loading Data
The input data from the EtherCAT slaves (slave A) is loaded during the I/O refresh (IO).
2
Instruction Execution
The motion control instructions (FB) are executed based on the data that was loaded during
user program execution (UPG).
The output variables of the motion control instructions are refreshed at this point.
3
Command Generation
Motion processing according to the motion control instructions (FB) that were executed is per-
formed during motion control (MC) immediately after user program execution in the primary
periodic task. During this processing, execution commands for the Servo Drives and other
devices are generated.
4
Sending Commands
The execution commands that were generated are sent to the Servo Drive or other device
during the I/O refresh (IO) in the next period.
Additional Information
• You can use the priority-5 periodic task only with NX701 CPU Units.
• The priority-5 periodic task is used when you want to divide functions configuring the deivce
for separate control, those functions that need high-speed control with the primary periodic
task and others with the priority-5 periodic task.
2-14
IN
Task period
IO
UPG
MC
FB
Execution of motion control instructions
Servo
Execution command
Task period
IO
UPG
MC
FB
NJ/NX-series CPU Unit Motion Control User's Manual (W507)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nx102-1Nx102-90Nj501Nj301-1Nx1p2-1Nx1p2-90 ... Show all

Table of Contents