Return the Server to the Normal Operating Position
Deploy any rack anti tilt mechanisms before installing the server into the rack.
Caution -
The server weighs approximately 18.1 kg (40.0 lbs). Two people are required to carry
Caution -
the chassis and install it into the rack.
Push the slide rails into the slide rail assemblies in the rack as far as possible.
1.
Raise the server so that the rear ends of the mounting brackets are aligned with
2.
the slide rail assemblies that are mounted in the rack.
3.
Insert the mounting brackets into the slide rails, and then push the server
into the rack until the mounting brackets encounter the slide rail stops,
approximately 30 cm (12 inches).
The server is now in the extended maintenance position.
Return the Server to the Normal Operating Position
Returning the Server to Operation
147