Oracle SPARC S7-2 Service Manual page 39

Hide thumbs Also See for SPARC S7-2:
Table of Contents

Advertisement

See
"Prepare to Power Off the Server" on page
2.
Log in to the Oracle ILOM (CLI) using an Administrator account.
3.
At the Oracle ILOM prompt, shut down the operating system:
->
stop /System
Power Off (Server Power Button - Graceful)
Use this procedure to place the server in the power standby mode. In this mode, the Power OK
LED blinks rapidly.
1.
Prepare to power off the server.
See
"Prepare to Power Off the Server" on page
2.
Press and release the recessed Server Power button.
You might need to use a pointed object, such as a pen or pencil.
Power Off (Server Power Button - Emergengy)
Use this procedure to force an immediate shut down of the server.
All applications and files will be closed abruptly without saving changes. File system
Caution -
corruption might occur.
1.
Prepare to power off the server.
See
"Prepare to Power Off the Server" on page
2.
Press and hold the Server Power button for five seconds.
Related Information
"Prepare to Power Off the Server" on page 38
"Disconnect Cables From the Server" on page 40
"Front Panel Components" on page 11
Power Off (Server Power Button - Graceful)
38.
38.
38.
Preparing for Service
39

Advertisement

Table of Contents
loading

Table of Contents