iTEMP TMT162
Endress+Hauser
1
2
9
Shielding and grounding the signal cable at one end with HART® communication
1
Supply unit
2
Grounding point for HART® communication cable shield
3
Grounding of the cable shield at one end
4
Optional grounding of the field device, isolated from cable shielding
5.4
Special connection instructions
If the device is fitted with a surge arrester module, the bus is connected and the power is
supplied via the screw terminals on the surge arrester module.
10
Electrical connection of surge arrester
5.4.1
Surge arrester function test
NOTICE
To perform the function test on the surge arrester module correctly:
‣
Remove the surge arrester module before performing the test.
‣
To do so, release screws (1) and (2) with a screwdriver as well as securing screw (3)
with an allen key.
‣
The surge arrester module can be lifted off easily.
‣
Perform the function test as shown in the following graphic.
3
Sensor 1
4
5
3
6
S2
-
Bus connection and
supply voltage
4
3
2
1
-
+
4
3
S1
+
+
-
-
-
+
Wiring
A0010984
A0033027-EN
19