Edge-Core ECS4620-28T Quick Start Manual page 2

28/52-port l3 stackable gigabit ethernet switch
Hide thumbs Also See for ECS4620-28T:
Table of Contents

Advertisement

Quick Start Guide
1. Unpack the Switch
2. Install the Switch
3. Ground the Switch
Unpack the switch and check the package contents.
L3 Stackable Gigabit Ethernet Switch
ECS4620-28T, ECS4620-28P, ECS4620-28F, ECS4620-52T, or ECS4620-52P
Rack Mounting Kit — includes two brackets and eight screws
Four adhesive foot pads
Power cord — either US, Continental Europe or UK
Console cable (RJ-45 to DB-9)
Documentation — Quick Start Guide and Regulatory and Safety Information
Documentation CD—includes Installation Guide, Web Management Guide, and
CLI Reference Guide
The switch can be mounted in a standard 19-inch rack or on a desktop or shelf.
Following your rack plan, mark the holes in the rack where the switch will be
installed. Lift the switch into the rack and hold it in a position aligned with the
marked holes. Secure the switch in the rack, using four rack-mounting screws (not
provided).
1
Attach the brackets to the switch.
2
Use the screws supplied with the rack to secure the switch in the rack.
Before powering on the switch, ground the switch to earth.
Ensure the rack on which the switch is to be mounted is properly grounded and in
compliance with ETSI ETS 300 253. Verify that there is a good electrical connection
to the grounding point on the rack (no paint or isolating surface treatment.).
Caution:
The earth connection must not be removed unless all supply
connections have been disconnected
2
– 2 –
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents