Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
3
Remove the PCIe riser assembly as follows.
Disengage the two hooks (1) from the chassis slots (2) that secure the riser
2 assembly to the chassis.
Grasp the riser assembly with both hands. With firm even pressure lift it
out of the connector on the mainboard.
Slot 1 is on the bottom of the riser. Remove the screw that secures slot 1
to the riser assembly.
Remove the metal cover plate from slot 1.
4
Remove the RAID controller card from the Expansion Storage Kit.
Installing the external RAID controller card
59