VERITAS NetBackup 5230 Hardware Installation Manual page 75

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
3
Verify that the power LED on each power module is green.
4
Locate the LEDs on each I/O module.
The following list describes the I/O module LED states.
Not lit - off
Solid green - ready (optimal)
Flashes green - N/A
Red - starting up
Turning on the hardware and verifying operation
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents