VERITAS NetBackup 5230 Hardware Installation Manual page 67

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
Connecting the 3U16 shelves to an appliance or to other 3U16 shelves
3
If a RAID controller card is not installed it and other components of the
Expansion Storage Kit must be installed. A Veritas-authorized field technician
performs the installation.
4
Use the following diagram as a reference.
SAS2 cable
5
Connect one end of a SAS2 cable to the right-hand port on the RAID controller.
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents