Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance

Connecting the 3U16 shelves to an appliance or to other 3U16 shelves

6
Locate the storage shelf I/O module that is on the same side as the RAID
controller connector into which you connected the SAS2 cable. The I/O module
is located above the power supply and fans.
Plug the other end of the SAS2 cable into the SAS_IN port in the I/O module.
7
Plug one end of the second SAS2 cable into the second connector in the RAID
controller.
8
Plug the other end of the second SAS2 cable into the second I/O module
SAS_IN port.
You can connect up to four storage shelves to the appliance. Refer to the following
section for instructions.
Connecting additional 3U16 storage shelves
Connecting additional 3U16 storage shelves
This section describes how to connect additional 3U16 storage shelves. You can
connect up to four storage shelves to one NetBackup 5230 Appliance.
Refer to the following diagrams as needed. Detailed instructions are provided after
the diagrams.