Preparing The Appliance To Install The Additional Hardware - VERITAS NetBackup 5230 Hardware Installation Manual

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

Preparing the appliance to install the additional
hardware
Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
3
At the login prompt, type
4
At the Password prompt, type the password that is assigned to the administrator
for this application. The default password is P@ssw0rd. The Main_Menu prompt
appears.
5
At the Main_Menu prompt, type
appears.
6
At the Support prompt, type
7
Wait for the appliance to shut down gracefully. (About five minutes.)
8
Turn off the switches on the power supplies.
Best practices recommend removing the appliance from the rack to access the
inside of the chassis. Alternatively you can pull out the appliance on its rails. Be
sure that the appliance and rack are stable.
To prepare the NetBackup 5230 appliance for the installation of the hardware
1
Verify that the appliance is turned off. Refer to this section as needed.
See
"Shutting down the appliance"
2
Disconnect the AC power cords and peripheral cables as applicable.
3
Slide the NetBackup 5230 appliance forward on the rails to the full extension.
Caution: The unit weighs up to 65 lbs (29.5 kg). Make sure that sliding it forward
does not destabilize the rack.
Note: If it is necessary to remove the unit from the rack, place the unit on a
grounded, ESD protective surface.
4
Do the following to remove the chassis cover:

Preparing the appliance to install the additional hardware

and press
admin
Enter
and press
support
and press
shutdown
on page 50.
.
. The Support prompt
Enter
.
Enter
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents