VERITAS NetBackup 5230 Hardware Installation Manual page 97

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
Insert the hooks on the riser (1) into the slots on the chassis (2).
Firmly push down on edges of the assembly to engage the mainboard
connector with the riser.
11
Replace the air duct as follows:
Installing the external RAID controller card
97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents