VERITAS NetBackup 5230 Hardware Installation Manual page 134

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
Number
10
4
Check the power supply module LEDs on the rear panel. Each module has
one LED.
Turning on the hardware and verifying operation
LED description
Status
134

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents