VERITAS NetBackup 5230 Hardware Installation Manual page 37

Hide thumbs Also See for NetBackup 5230:
Table of Contents

Advertisement

3
Turn on both power switches.
4
On the front panel of the storage shelf check the system LEDs.
System LEDs
Power (1)
Global enclosure
status (2)
Reserved (3)
I/O Module 1
activity (4)
I/O Module 2
activity (5)
Heartbeat (6)
Verifying hardware operation and configuring IPMI
State
Description
Not lit
Off
Solid green
On
Not lit
Off
Solid green
On
Amber
One power supply offline
Red
Both power supplies offline
N/A
N/A
Not lit
No activity
Flashes green
Activity
Not lit
No activity
Flashes green
Activity
Not lit
System off
Flashes green
Normal operation
Turning on the storage shelves
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents