Maintenance
As-Needed/As-Required Maintenance
4
Select
Continue
OR
Select
Cancel
IMPORTANT
5
Disconnect the electrode cable (1).
Figure 9.48
6
Loosen the flow cell retaining captive screw (1) located at the top of the flow cell. Pull flow cell
assembly forward.
Figure 9.49
9-70
. This drains the flow cell of reagent so that the electrode may be replaced.
to immediately return to the Maintenance menu without draining the flow cell.
Do not disconnect any of the reagent lines attached to the flow cell.
A13914AF