Replacement Procedure
1
To access this procedure, select:
•
Utils
•
2 Maintenance
•
1 CTS Blade Replacement
To start the procedure, select
OR
To exit this screen, select
2
The instrument prepares for blade and wick replacement, then the
confirmation window appears.
CAUTION
The points of the Blade are very sharp and extend below the Wash Tower. Avoid
the bottom of the Wash Tower.
CAUTION
DO NOT select OK when the cover is removed. If you select OK the Cap Piercer
Carriage moves up and causes a pinch hazard.
3
Fully loosen the two captive Cap Piercer cover screws (1) at the base of the Cap Piercer cover.
Lift and remove the cover.
Figure 9.22
A13914AF
from the menu bar
.
Continue
.
Cancel
1
.
A014462P.EPS
Maintenance
Two-Month Maintenance
pop-up
Maintenance
9-37
9