Maintenance
Monthly Maintenance
9
Place a fresh bottle of alkaline buffer on the system. Wipe reagent straw and replace bottle cap
onto the new reagent bottle.
Figure 9.9
10
Load reagent information from bottle bar code into the system either automatically using the
hand-held bar code reader, or manually using the keyboard. Refer to
Calibration
11
Select
Done F10
12
While priming with the alkaline buffer reagent, check the peri-pump tubing and line for leaks
or other problems. Correct as needed.
13
Adjust the fluid level of the Alkaline Buffer Damper Assembly. Refer to the
of the Alkaline Buffer Damper Assembly
CAUTION
Pinch hazard. Keep fingers clear of the ISE module as you lower it.
14
Lower the ISE module by releasing the locking pin. Be careful NOT to pinch tubing as the module
is lowered.
15
Reinstall the ISE module cover.
9-20
in this manual.
when finished.
procedure.
CHAPTER 4, Reagent Load/
Adjust the Fluid Level
A13914AF