Toshiba strata CT Installation & Maintenance Manual page 68

Digital business telephone system
Hide thumbs Also See for strata CT:
Table of Contents

Advertisement

Strata CT Installation
23. Add remaining cabinets, making sure that the cabinets are connected together at points
24. For systems with four or more cabinets, make sure that wall brackets (RWBF) are
25. Connect the data cable of each Expansion Cabinet to the applicable data cable connector
26. Install ground wiring, AC and reserve power cabling, and PCB cabling per the
27. Fill out cabinet/slot identification labels on each cabinet (see
H
C
2-32
A and B with screws provided.
installed on both sides of the top cabinet, in addition to cabinet three.
on the Base Cabinet
(Figures 2-8
Cabinet should be connected to the connector labelled "CAB. 2", the cable from the
second Expansion Cabinet to the "CAB. 3" connector, etc.)
"Recommended Installation Sequence" on Page
covers on the cabinets. (The top cover should be installed on the top cabinet.)
and 2-11). The data cable from the first Expansion
2-5.
Strata CT I&M Manual October 2000
Figure
2-7), then reinstall

Advertisement

Table of Contents
loading

Table of Contents